As a part of station improvement work at Mira Road station, the south-side staircase of the second southernmost Foot Over Bridge (FOB) at Platform No. 1 requires dismantling.
In view of the above, the said staircase will remain closed for commuters from the night of 25th July, 2025. Commuters can use the existing staircases, escalators, and elevators connected to the Middle FOB, North FOB, and South FOB at Platform No. 1 of Mira Road station.
Mumbai News: BMC Sanitation Workers Call Off Strike After Assurances On Job Security, Regularisation Of Contract StaffInconvenience to the passengers is highly regretted.
You may also like
DRDO tests missile fired from drone
Take steps to extradite fugitives, says Amit Shah
Southwest Airlines passengers thrown out of seats as pilot 'avoids collision'
Mumbai News: Zone 8 Police Return Recovered Stolen Property Worth ₹1.54 Crore To Owners
PM Modi, President Muizzu sign agreements; further strengthen bilateral ties between India and Maldives: MEA